Lots of work picking out things and making decisions but not a ton of visual progress other than the house is wrapped in Tyvek! The plumber, electrician and HVAC folks have been doing a lot of work inside the house. Some minor structural work set us back about $1100 - some joists had been cut by the original builder that were load bearing! Yikes - although they'd still held up the house for the past 70 years.
Double support on the joists that had been cut when the house was originally built (structural issue fixed)
Switch locations coming into the kitchen
Combined closets from master & bedroom into one.
This new closet is really deep!
New plumbing in Quinn's bathroom
Windows in the master bath. Unfortunately we had to decide whether to have the windows be perfect from the outside or centered on the inside. We chose to have it look good from the outside. The soaking tub will sit in front of the windows but won't be perfectly centered.

Going to have yet another weird angle in our basement bathroom in order to get the hvac to the new bedroom. Ah, old houses! This was originally the window that went to the outside of the house.
Closet area of new basement bedroom
New basement bedroom/window
- We walked the house on Friday to go over outlet locations and switch locations. We also had to make some shifts to the doors due to space constraints/plumbing locations.
- Pantry pocket door has to become a barn door (I don't want a traditional door as I think I'll keep it open most of the time.
- Toilet door in our bathroom is becoming a pocket door due to space.
- The master bedroom & master closet doors felt like they might interfere with each other so we're making the master closet door a pocket door.
- Quinn decided he wants to stay in his current room (the smaller of the two bedrooms). He saw the large walk in closet with two windows on a day when the sunshine was just pouring in - and thought about having a small desk and doing his schoolwork in there. We're going to alter the closet shelves to allow for that.
- Now that the larger of the two bedrooms will become my office, I'm trying to think of how to use all the space. Perhaps a daybed or an exercise area. Who know.
- We picked out doorknobs and hinge colors. Who knew that was going to be so difficult!
- Standing seam metal roof color picked out.
Lots of large decisions were made:
- Appliances have been picked out although we're still figuring out the microwave. The woman who helped us with appliances convinced us on the amazingness of a convection microwave for those baking smaller things. We're used to a 30" range but are sizing up to 36".
- Finalized a few more accessories for the bathrooms and kitchen (faucets, towel rings, etc).
- I've been researching different security systems and we're close to making a decision. We'll have some wired cameras going in.
- We're still trying to figure out our master bathroom vanity but have narrowed it down to 3 options.
House is wrapped.
Walked the property to check switch locations - these are in Mike's office
Switch locations coming into the kitchen
Combined closets from master & bedroom into one.
This new closet is really deep!
New plumbing in Quinn's bathroom
New plumbing in the master bathroom
Entrance to master toilet (left) and master shower (right). Plumbing is being moved to allow for pocket door in the toilet area.
Windows in the master bath. Unfortunately we had to decide whether to have the windows be perfect from the outside or centered on the inside. We chose to have it look good from the outside. The soaking tub will sit in front of the windows but won't be perfectly centered.
Entrance to the new bedroom in the basement.
Closet area of new basement bedroom
New basement bedroom/window